Derate Policy & Approval: Step-by-Step Walkthrough
Step-by-Step Walkthrough for Derate Policy & Approval.
Step-by-step analysis walkthrough
Use when you own Derate Policy & Approval in a timing war room.
Open signoff scenario list — note worst WNS corner.
report_timing -max/-min on failing group.
Trace launch and capture clocks on critical path.
Check exceptions and generated clocks on path.
Break down cell vs net delay.
Compare implementation vs signoff view if delta suspicious.
Assign owner: RTL, synth, PD, CTS, SI.
Propose ECO with hold/SI check plan.
Run regression matrix.
Update closure dashboard and memo.
Artifacts to collect
derate approval memo, signoff policy PDF, before/after WNS comparison
SDC file
SPEF tag
MMMC scenario list
ECO ticket
Decision memo template
STA DECISION MEMO — Derate Policy & Approval
corner/mode:
WNS/TNS:
hypothesis:
ECO:
regression:
owners: STA lead, PD director, foundry signoffReference visuals
Derate approval flow
DERATE CHANGE REQUEST
-> STA lead review
-> PD director sign
-> foundry policy check
-> re-run full MMMC matrix
-> archive before/after WNSSTA deep dive
Variation policy is negotiated margin, not a tool checkbox.
Concept diagram
VARIATION STACK
nominal delay + OCV/AOCV/POCV margin = signoff delayMetric graph
DERATE IMPACT ON WNS
OCV only WNS -120ps
AOCV WNS -45ps
POCV WNS -60ps (policy dependent)Reports and artifacts
derate table
AOCV depth report
POCV sigma
hold/setup split
Mini case study
Switched to AOCV without re-baselining hold — short paths failed min analysis.
Debug branches
Short paths for hold
Policy approval for derate changes
Senior review question
Ask: what corner/mode/view proves this topic is closed or failing?
Key takeaways
State corner, mode, view, and database tag with every slack claim.
Run setup and hold plus MMMC regression after every ECO.
Common pitfalls
Comparing STA runs with different SPEF or SDC tags.
Broad false_path to green-wash violations.
Setup-only ECO without hold check.
Principal STA review addendum
Derating policy is a contractual margin between implementation and signoff; changes need documented approval and regression.
Metric: approved derate set, waiver count, signoff pessimism budget