Skip to content
DenseChip
Learn
PracticeCode labInterview

DenseChip

Navigate

Menu

LearnPracticeCode labInterview

Tools

All toolsSV editorCode repoResume
DenseChip

Practice, courses, and chip-design tools in one focused workspace.

LearnPracticeCode labInterviewToolsLearning paths

© 2026 DenseChip

AboutContactPrivacyTerms
Skip to lesson

Course contents

  • How to Use This Course
  • PD Flow Overview — RTL to GDSII
  • Data & Libraries — What PD Receives
  • Data and Libraries49
  • Floorplanning Expanded65
  • Power Planning57
  • Placement65
  • Clock Tree Synthesis57
  • Routing65
  • Timing Closure81
    • SDC for Implementation
    • Setup/Hold Closure Playbook
    • MCMM Signoff Strategy
    • ECO Timing Fixes
    • Path Group Prioritization
      • Path Group Prioritization — Mechanism
      • Path Group Prioritization — Inputs & Outputs
      • Path Group Prioritization — Reports & Metrics
      • Path Group Prioritization — Debug Playbook
      • Path Group Prioritization — Worked Example
      • Path Group Prioritization — Pitfalls & Red Flags
      • Path Group Prioritization — Interview Drills
      • Path Group Prioritization — Review Checklist
    • Generated Clocks and Clock Groups
    • IO Timing and Block Boundaries
    • Useful Skew in Timing Closure
    • Post-Route Extraction and SPEF
    • Timing Signoff Dashboard
    • Timing Closure Tricky Q&A
  • Signal Integrity and Variation41
  • Power Signoff57
  • Physical Verification65
  • Physical Design Integration49
  • Signoff and Tapeout49
  • PD Interview Prep5
  • PD Closure Cheat Sheet
Loading lesson

‹Path Group Prioritization
  1. Topics
  2. Physical Design
  3. Timing Closure
  4. Path Group Prioritization
  5. Path Group Prioritization — Review Checklist

Physical Design · All levels

Path Group Prioritization — Review Checklist

Review Checklist for Path Group Prioritization (Timing Closure).

On this page

    Review gate

    1. Inputs versioned and match RTL/SDC tag

    2. Primary metric meets spec or documented waiver

    3. Regression list executed on tagged database

    4. Risks logged with owner and date

    5. Handoff notes updated for next stage

    Smoke check (5 minutes)

    • Every checklist item has an owner

    • Failed items have mitigation or waiver ID

    Definition of done for a senior owner

    1. The exact database tag and analysis setup are recorded.

    2. The primary metric is clean or accepted by waiver: Path-group ranking dashboard (WNS, TNS, violating endpoints, churn).

    3. The fix is explained by mechanism, not by tool folklore.

    4. Regression coverage includes the obvious downstream domains: timing, routing, power, PV, DFT, package, or tapeout signoff.

    5. Residual risk has an owner, approval path, and expiration date.

    6. The lesson is captured as a methodology guardrail if it can recur.

    Smoke check (5 minutes)

    • Could another engineer reproduce the conclusion from the notes alone?

    • Would you sign this off if the design came from another team?

    Deep dive: how this shows up in real closure

    Timing closure is a signoff matrix problem, not a single worst-path problem.

    Reports and artifacts to inspect

    • report_timing -max and -min with corner, mode, SI, and OCV enabled

    • path group WNS/TNS: which clock domain is actually blocking signoff

    • net delay percentage vs cell delay percentage

    • exception audit: false paths, multicycle paths, generated clocks

    Mini case study

    A -90 ps setup path has 75% net delay and crosses a macro channel. Sizing the launch flop is weak. The stronger response is to layer-promote or shorten the route, then re-run hold at the fast corner.

    Debug branches

    • If net delay dominates, look for physical fixes before cell sizing.

    • If cell delay dominates, consider VT swap, sizing, or RTL micro-architecture.

    • If only one mode fails, inspect mode-specific SDC overlays and case analysis.

    Senior review question

    Ask yourself: what single report line would prove this page's concept is either passing or failing?

    What changes at 10+ years

    • You are expected to predict what your fix can break before running it.

    • You should recognize when the issue is methodology, not one block's implementation.

    • You should communicate risk in tapeout language: owner, evidence, impact, mitigation, and decision date.

    Principal-level review bar

    Deep subpage pages in this course should be read like real closure review material. For a 10+ year PD engineer, the bar is not remembering terminology; it is making a release-quality decision under ambiguity.

    What excellent looks like

    • Names the failing metric, corner/mode, database tag, and analysis switches before proposing a fix.

    • Separates data, constraint, physical, tool, and methodology root causes instead of treating all failures as optimization problems.

    • Chooses experiments by information gain and reversibility, not by habit.

    • States regression blast radius across timing, route, power, PV, DFT, package, and tapeout manifest.

    • Turns recurring failures into methodology guardrails, dashboards, or checklist items.

    Closure note template

    Diagram
    STAFF / PRINCIPAL CLOSURE NOTE
    
    Context:
      stage: <pre-CTS | post-CTS | post-route | post-fill | signoff>
      tag: <database / netlist / SDC / library stack>
      failing metric: <exact report line>
      affected scope: <block / hierarchy / path group / power domain / region>
    
    Hypotheses:
      H1: <most likely physical or constraint mechanism>
      H2: <competing explanation>
      H3: <methodology or input-data issue>
    
    Decision:
      next experiment: <cheap check that can falsify H1>
      fix candidate: <minimal reversible change>
      rollback trigger: <metric that says the fix is wrong>
      regression set: <timing / route / power / PV / DFT / package>
      escalation owner: <team or reviewer>

    Tradeoffs a senior engineer must discuss

    Technical tradeoff

    Timing closure is a signoff matrix problem, not a single worst-path problem. Explain not only the preferred fix, but what margin or schedule you are spending to get it.

    Cross-team tradeoff

    • What must RTL, synthesis, CAD, STA, DFT, package, IP, or foundry agree to before this decision is final?

    • Which artifact becomes the source of truth after the decision: report, waiver, manifest, ECO script, or methodology deck?

    • What is the cost of being wrong: one rerun, ECO churn, mask risk, performance loss, or silicon escape?

    Leadership communication

    Diagram
    "The current blocker is <metric> in <corner/mode/stage>. The leading cause is <mechanism>. I recommend <fix> because it is bounded and reversible. The regression surface is <domains>. If it fails, we escalate to <owner> with <evidence>."

    Key takeaways

    • Always connect the concept back to a measurable signoff artifact.

    • A fix is not complete until you can name the regression checks.

    Common pitfalls

    • Optimizing by habit instead of reading the current report.

    • Forgetting that a local fix can regress timing, routing, power, or PV elsewhere.

    Previous

    475 / 709

    Next: Placement Quality Metrics and Readiness Gates — Review Checklist

    Up next

    Up nextPlacement Quality Metrics and Readiness Gates — Review Checklist

    Sign in to save progress

    Practice this lessonReport an error

    See also

    • Path Group Prioritization — Mechanism
    • Path Group Prioritization — Inputs & Outputs
    • Path Group Prioritization — Reports & Metrics