Physical Design · All levels

Setup/Hold Closure Playbook — Review Checklist

Review Checklist for Setup/Hold Closure Playbook (Timing Closure).

Review gate

  1. Worst setup and hold corners are explicitly listed

  2. Every fix includes before/after metric and owner

  3. No unexplained TNS growth while improving WNS

  4. Hold recovery includes setup regression check

  5. Signoff runset version recorded

Smoke check (5 minutes)

  • Every checklist item has an owner

  • Failed items have mitigation or waiver ID

Definition of done for a senior owner

  1. The exact database tag and analysis setup are recorded.

  2. The primary metric is clean or accepted by waiver: report_timing (worst path clusters) + WNS/TNS trend.

  3. The fix is explained by mechanism, not by tool folklore.

  4. Regression coverage includes the obvious downstream domains: ECO timing fixes.

  5. Residual risk has an owner, approval path, and expiration date.

  6. The lesson is captured as a methodology guardrail if it can recur.

Smoke check (5 minutes)

  • Could another engineer reproduce the conclusion from the notes alone?

  • Would you sign this off if the design came from another team?

Deep dive: how this shows up in real closure

Timing closure is a signoff matrix problem, not a single worst-path problem.

Reports and artifacts to inspect

  • report_timing -max and -min with corner, mode, SI, and OCV enabled

  • path group WNS/TNS: which clock domain is actually blocking signoff

  • net delay percentage vs cell delay percentage

  • exception audit: false paths, multicycle paths, generated clocks

Mini case study

A -90 ps setup path has 75% net delay and crosses a macro channel. Sizing the launch flop is weak. The stronger response is to layer-promote or shorten the route, then re-run hold at the fast corner.

Debug branches

  • If net delay dominates, look for physical fixes before cell sizing.

  • If cell delay dominates, consider VT swap, sizing, or RTL micro-architecture.

  • If only one mode fails, inspect mode-specific SDC overlays and case analysis.

Senior review question

Ask yourself: what single report line would prove this page's concept is either passing or failing?

What changes at 10+ years

  • You are expected to predict what your fix can break before running it.

  • You should recognize when the issue is methodology, not one block's implementation.

  • You should communicate risk in tapeout language: owner, evidence, impact, mitigation, and decision date.

Principal-level review bar

Deep subpage pages in this course should be read like real closure review material. For a 10+ year PD engineer, the bar is not remembering terminology; it is making a release-quality decision under ambiguity.

What excellent looks like

  • Names the failing metric, corner/mode, database tag, and analysis switches before proposing a fix.

  • Separates data, constraint, physical, tool, and methodology root causes instead of treating all failures as optimization problems.

  • Chooses experiments by information gain and reversibility, not by habit.

  • States regression blast radius across timing, route, power, PV, DFT, package, and tapeout manifest.

  • Turns recurring failures into methodology guardrails, dashboards, or checklist items.

Closure note template

diagram
STAFF / PRINCIPAL CLOSURE NOTE

Context:
  stage: <pre-CTS | post-CTS | post-route | post-fill | signoff>
  tag: <database / netlist / SDC / library stack>
  failing metric: <exact report line>
  affected scope: <block / hierarchy / path group / power domain / region>

Hypotheses:
  H1: <most likely physical or constraint mechanism>
  H2: <competing explanation>
  H3: <methodology or input-data issue>

Decision:
  next experiment: <cheap check that can falsify H1>
  fix candidate: <minimal reversible change>
  rollback trigger: <metric that says the fix is wrong>
  regression set: <timing / route / power / PV / DFT / package>
  escalation owner: <team or reviewer>

Tradeoffs a senior engineer must discuss

Technical tradeoff

Timing closure is a signoff matrix problem, not a single worst-path problem. Explain not only the preferred fix, but what margin or schedule you are spending to get it.

Cross-team tradeoff

  • What must RTL, synthesis, CAD, STA, DFT, package, IP, or foundry agree to before this decision is final?

  • Which artifact becomes the source of truth after the decision: report, waiver, manifest, ECO script, or methodology deck?

  • What is the cost of being wrong: one rerun, ECO churn, mask risk, performance loss, or silicon escape?

Leadership communication

diagram
"The current blocker is <metric> in <corner/mode/stage>. The leading cause is <mechanism>. I recommend <fix> because it is bounded and reversible. The regression surface is <domains>. If it fails, we escalate to <owner> with <evidence>."

Key takeaways

  • Always connect the concept back to a measurable signoff artifact.

  • A fix is not complete until you can name the regression checks.

Common pitfalls

  • Optimizing by habit instead of reading the current report.

  • Forgetting that a local fix can regress timing, routing, power, or PV elsewhere.