Path Group War Room: Review Checklist
Review Checklist for Path Group War Room.
Review checklist
Review Checklist for Path Group War Room focuses on WNS per path group, endpoint owner assignment rate. The goal is to connect the observable symptom to timing mechanism, ownership, and regression risk.
SDC revision and implemented clock/exception policy are named.
Clock/reset and CDC assumptions are reviewed.
Path groups, IO delays, and exception rationale are documented.
MMMC scenario list maps back to signoff requirements.
WNS/TNS artifact stored with corner/mode/view tags.
Owners signed: timing closure lead, STA lead.
Sign-off ownership
OWNERSHIP MAP — Path Group War Room
artifact owner
---------------- -----------------
timing report timing closure lead
SDC/constraint STA lead
Every WNS cluster needs a named owner before ECO.STA deep dive
Debug hygiene separates senior STA leads from report readers.
Concept diagram
DEBUG ORDER
1. same tags? 2. constraints? 3. view? 4. real path? 5. ECOMetric graph
ROOT CAUSE MIX (typical)
constraint bugs ████████ 35%
view mismatch ██████ 25%
real path ██████ 25%
methodology ████ 15%Reports and artifacts
run manifest
SDC diff
SPEF tag
scenario isolation
Mini case study
Mystery regression: SPEF corner tag typo in run script — not a design bug.
Debug branches
Manifest every run
War room by path group
Senior review question
Ask: what corner/mode/view proves this topic is closed or failing?
Key takeaways
State corner, mode, view, and database tag with every slack claim.
Run setup and hold plus MMMC regression after every ECO.
Common pitfalls
Comparing STA runs with different SPEF or SDC tags.
Broad false_path to green-wash violations.
Setup-only ECO without hold check.
Principal STA review addendum
War rooms assign failing path groups to owning teams (RTL, synth, PD, CTS) based on delay breakdown and path class.
Metric: WNS per path group, endpoint owner assignment rate