Path Group War Room: Design Space
Design Space for Path Group War Room.
Design space exploration
For Path Group War Room, closure options trade margin, schedule, and regression risk.
Option A — conservative
Conservative margin: helps safe signoff
Risk: over-pessimism, area/power
Validate with: first silicon
Option B — balanced
Balanced derate: helps reasonable margin
Risk: needs approval
Validate with: mature node
Option C — aggressive ECO
Aggressive ECO: helps fast WNS gain
Risk: hold/SI regressions
Validate with: late schedule
Option D — RTL restructure
RTL restructure: helps structural fix
Risk: schedule hit
Validate with: chronic paths
DESIGN SPACE — Path Group War Room
margin <-> performance <-> schedule
pick based on WNS per path group, endpoint owner assignment rate on product scenariosDesign pitfalls
ECO without regression matrix
Constraint change without audit
Tradeoff curve
BEFORE / AFTER ECO — Path Group War Room
WNS (ps)
0 | --- target
-50 | ● regressed
-80 | ● before ECO
-20 | ● after ECO
+-------------------------------> ECO iteration
Prove setup AND hold moved safely.STA deep dive
Debug hygiene separates senior STA leads from report readers.
Concept diagram
DEBUG ORDER
1. same tags? 2. constraints? 3. view? 4. real path? 5. ECOMetric graph
ROOT CAUSE MIX (typical)
constraint bugs ████████ 35%
view mismatch ██████ 25%
real path ██████ 25%
methodology ████ 15%Reports and artifacts
run manifest
SDC diff
SPEF tag
scenario isolation
Mini case study
Mystery regression: SPEF corner tag typo in run script — not a design bug.
Debug branches
Manifest every run
War room by path group
Senior review question
Ask: what corner/mode/view proves this topic is closed or failing?
Key takeaways
State corner, mode, view, and database tag with every slack claim.
Run setup and hold plus MMMC regression after every ECO.
Common pitfalls
Comparing STA runs with different SPEF or SDC tags.
Broad false_path to green-wash violations.
Setup-only ECO without hold check.
Principal STA review addendum
War rooms assign failing path groups to owning teams (RTL, synth, PD, CTS) based on delay breakdown and path class.
Metric: WNS per path group, endpoint owner assignment rate