Path Group War Room: Design Space

Design Space for Path Group War Room.

Design space exploration

For Path Group War Room, closure options trade margin, schedule, and regression risk.

Option A — conservative

  • Conservative margin: helps safe signoff

  • Risk: over-pessimism, area/power

  • Validate with: first silicon

Option B — balanced

  • Balanced derate: helps reasonable margin

  • Risk: needs approval

  • Validate with: mature node

Option C — aggressive ECO

  • Aggressive ECO: helps fast WNS gain

  • Risk: hold/SI regressions

  • Validate with: late schedule

Option D — RTL restructure

  • RTL restructure: helps structural fix

  • Risk: schedule hit

  • Validate with: chronic paths

diagram
DESIGN SPACE — Path Group War Room
margin <-> performance <-> schedule
pick based on WNS per path group, endpoint owner assignment rate on product scenarios

Design pitfalls

  • ECO without regression matrix

  • Constraint change without audit

Tradeoff curve

diagram
BEFORE / AFTER ECO — Path Group War Room

WNS (ps)
  0 |                    --- target
-50 |    ● regressed
-80 |         ● before ECO
-20 |              ● after ECO
    +-------------------------------> ECO iteration
Prove setup AND hold moved safely.

STA deep dive

Debug hygiene separates senior STA leads from report readers.

Concept diagram

diagram
DEBUG ORDER

1. same tags?  2. constraints?  3. view?  4. real path?  5. ECO

Metric graph

diagram
ROOT CAUSE MIX (typical)

constraint bugs  ████████  35%
view mismatch    ██████    25%
real path        ██████    25%
methodology      ████      15%

Reports and artifacts

  • run manifest

  • SDC diff

  • SPEF tag

  • scenario isolation

Mini case study

Mystery regression: SPEF corner tag typo in run script — not a design bug.

Debug branches

  • Manifest every run

  • War room by path group

Senior review question

Ask: what corner/mode/view proves this topic is closed or failing?

Key takeaways

  • State corner, mode, view, and database tag with every slack claim.

  • Run setup and hold plus MMMC regression after every ECO.

Common pitfalls

  • Comparing STA runs with different SPEF or SDC tags.

  • Broad false_path to green-wash violations.

  • Setup-only ECO without hold check.

Principal STA review addendum

War rooms assign failing path groups to owning teams (RTL, synth, PD, CTS) based on delay breakdown and path class.

Metric: WNS per path group, endpoint owner assignment rate