STA Mastery · All levels
Path Group War Room: Interview Drills
Interview Drills for Path Group War Room.
Interview drills
Interview Drills for Path Group War Room focuses on WNS per path group, endpoint owner assignment rate. The goal is to connect the observable symptom to timing mechanism, ownership, and regression risk.
PROMPT
You see WNS per path group, endpoint owner assignment rate on Path Group War Room. Walk through root cause and fix.
STRONG ANSWER
1. Names corner/mode/view and path group.
2. Explains War rooms assign failing path groups to owning teams (RTL, synth, PD, CTS) based on delay breakdown and path class.
3. Requests path group heatmap, owner assignment sheet, daily WNS standup notes.
4. Proposes one reduced sequence and one system regression.
WEAK ANSWER
Jumps to upsizing cells, widening routes, or blaming tools without reading constraints and path delay.Diagram to draw on the whiteboard
War room board
PATH GROUP | WNS | OWNER | ACTION
reg2reg | -80 | PD | upsize buf
in2reg | -40 | STA+pkg | IO delay review
reg2cg | -25 | CTS | skew checkRoot-cause tree to narrate
ROOT-CAUSE TREE — Path Group War Room
WNS per path group, endpoint owner assignment rate looks wrong
|
same netlist tag?
/ \
no yes
| |
view/SDC real path or
mismatch constraint bug
/ \ |
lib SPEF delay breakdown
diff diff cell vs netSTA deep dive
Debug hygiene separates senior STA leads from report readers.
Concept diagram
DEBUG ORDER
1. same tags? 2. constraints? 3. view? 4. real path? 5. ECOMetric graph
ROOT CAUSE MIX (typical)
constraint bugs ████████ 35%
view mismatch ██████ 25%
real path ██████ 25%
methodology ████ 15%Reports and artifacts
run manifest
SDC diff
SPEF tag
scenario isolation
Mini case study
Mystery regression: SPEF corner tag typo in run script — not a design bug.
Debug branches
Manifest every run
War room by path group
Senior review question
Ask: what corner/mode/view proves this topic is closed or failing?
Key takeaways
State corner, mode, view, and database tag with every slack claim.
Run setup and hold plus MMMC regression after every ECO.
Common pitfalls
Comparing STA runs with different SPEF or SDC tags.
Broad false_path to green-wash violations.
Setup-only ECO without hold check.
Principal STA review addendum
War rooms assign failing path groups to owning teams (RTL, synth, PD, CTS) based on delay breakdown and path class.
Metric: WNS per path group, endpoint owner assignment rate