STA Mastery · All levels
Path Group War Room: Worked Example
Worked Example for Path Group War Room.
Worked example
Worked Example for Path Group War Room focuses on WNS per path group, endpoint owner assignment rate. The goal is to connect the observable symptom to timing mechanism, ownership, and regression risk.
A signoff run shows WNS per path group, endpoint owner assignment rate. The first review mistake is to blame implementation without checking constraints. A better review starts by pinning one critical path, proving where slack was lost, and checking whether the SDC rule is correct for Path Group War Room.
Sequence under inspection
TIMING PATH — Path Group War Room
launch FF --logic stages--> capture FF
| |
launch clock capture clock
| |
required: arrival < capture_edge - setup
metric: WNS per path group, endpoint owner assignment rateWar room board
PATH GROUP | WNS | OWNER | ACTION
reg2reg | -80 | PD | upsize buf
in2reg | -40 | STA+pkg | IO delay review
reg2cg | -25 | CTS | skew checkCapture report_timing and the relevant SDC excerpt.
Tag corner, mode, view, and path group.
Find the first cell or net that dominates critical delay.
Compare against path group heatmap, owner assignment sheet, daily WNS standup notes.
Choose one reversible ECO and write the regression matrix before editing netlist or constraints.
Did the fix work?
BEFORE / AFTER ECO — Path Group War Room
WNS (ps)
0 | --- target
-50 | ● regressed
-80 | ● before ECO
-20 | ● after ECO
+-------------------------------> ECO iteration
Prove setup AND hold moved safely.STA deep dive
Debug hygiene separates senior STA leads from report readers.
Concept diagram
DEBUG ORDER
1. same tags? 2. constraints? 3. view? 4. real path? 5. ECOMetric graph
ROOT CAUSE MIX (typical)
constraint bugs ████████ 35%
view mismatch ██████ 25%
real path ██████ 25%
methodology ████ 15%Reports and artifacts
run manifest
SDC diff
SPEF tag
scenario isolation
Mini case study
Mystery regression: SPEF corner tag typo in run script — not a design bug.
Debug branches
Manifest every run
War room by path group
Senior review question
Ask: what corner/mode/view proves this topic is closed or failing?
Key takeaways
State corner, mode, view, and database tag with every slack claim.
Run setup and hold plus MMMC regression after every ECO.
Common pitfalls
Comparing STA runs with different SPEF or SDC tags.
Broad false_path to green-wash violations.
Setup-only ECO without hold check.
Principal STA review addendum
War rooms assign failing path groups to owning teams (RTL, synth, PD, CTS) based on delay breakdown and path class.
Metric: WNS per path group, endpoint owner assignment rate