CDC / RDC · All levels

Synchronizer Selection Guide: Comparison Matrix

Comparison Matrix for Synchronizer Selection Guide.

Comparison matrix

Synchronizer choices trade latency, reliability, and proof burden.

diagram
+------------------+----------------+----------------+----------------+
| Approach         | Strength       | Weakness       | Best when      |
+------------------+----------------+----------------+----------------+
| Conservative     | safe           | extra latency  | high-risk crossings |
| Balanced         | practical      | more setup     | most production paths |
| Aggressive       | fast schedule  | escape risk    | late-stage crunch |
| Refactor         | structural gain | long cycle     | recurring failures |
+------------------+----------------+----------------+----------------+

When to choose each approach

  • Select approach by silicon risk, not only schedule urgency

Interview traps

  • Global waiver spray

  • Unproven protocol assumptions

Evidence comparison

diagram
CDC/RDC EVIDENCE MATRIX — Synchronizer Selection Guide

+-----------------------+----------------------------+----------------------------+---------------------------+
| Evidence              | Tells you                  | Does not prove             | Next action               |
+-----------------------+----------------------------+----------------------------+---------------------------+
| structural report     | crossing topology class    | protocol liveness          | add assertions/formal     |
| reset map             | release dependencies       | dynamic startup behavior   | run reset stress tests    |
| formal proof          | bounded safety/liveness    | real firmware sequence     | correlate with simulation |
| simulation stress     | observed mode behavior     | full state-space closure   | target unhit corners      |
| waiver log            | accepted residual risk     | technical correctness      | periodic revalidation     |
+-----------------------+----------------------------+----------------------------+---------------------------+

CDC/RDC deep dive

Metastability is managed risk, not eliminated risk.

Concept diagram

diagram
METASTABILITY FLOW

async event -> first sample may metastabilize
 -> settle window
 -> downstream sample confidence

Metric graph

diagram
MTBF TREND

target MTBF ---------
current design   ____/

Reports and artifacts

  • MTBF assumptions

  • synchronizer inventory

  • crossing class summary

  • critical waivers

Mini case study

Pulse sync chosen for a level signal caused intermittent stuck state under voltage stress.

Debug branches

  • Validate crossing class first

  • Check pulse width assumptions

  • Audit synchronizer template usage

Senior review question

Ask: what evidence proves this risk is closed for silicon, not just tool-clean?

Key takeaways

  • State crossing class, assumptions, and owner with every issue.

  • Run structural and dynamic regressions after each fix.

Common pitfalls

  • Treating all warnings as equivalent risk.

  • Waiving issues without containment evidence.

  • Skipping reset and reconvergence stress after CDC fixes.

Principal CDC/RDC review addendum

Crossing intent (level, pulse, bus, control/data coupling) determines legal synchronization topology and verification evidence.

Metric: crossing class coverage, incorrect pattern usage rate, waiver count