DFT / ATPG · All levels

BIST Signoff: Inputs & Outputs

Inputs & Outputs for BIST Signoff.

Inputs and outputs contract

Inputs & Outputs for BIST Signoff focuses on MBIST/LBIST pass criteria, startup test time, in-field diagnostic readiness. The goal is to convert metric movement into mechanism, owner, and release decision.

Treat these as a release contract. Ambiguity here creates expensive debug loops because teams optimize against different assumptions.

diagram
INPUTS
  - scan/ATPG architecture and constraints
  - fault model and quality target policy
  - pattern generation config + tester limits
  - timing/power/physical assumptions

OUTPUTS
  - quality metrics and closure status
  - signed artifacts and owner approvals
  - diagnosis evidence for residual risk
  - release, waiver, or escalation decision

Flow sequence

diagram
DFT FLOW - BIST Signoff

scan insertion -> chain stitch -> compression map -> ATPG -> tester apply -> diagnosis
      |                |                |            |             |
 controllability   shift balance    channel use   coverage     silicon correlation

Primary metric: MBIST/LBIST pass criteria, startup test time, in-field diagnostic readiness

Ownership map

diagram
OWNERSHIP MAP - BIST Signoff

artifact              owner
----------------      -----------------
architecture/report DFT lead
constraints/setup   product test owner
physical/test       quality owner

Name an owner for each failing metric cluster.

DFT deep dive

BIST value is realized only when insertion, diagnosis, and repair are tied to production flow.

Concept diagram

diagram
BIST FLOW

insert MBIST/LBIST -> execute -> collect signatures -> diagnose/repair -> signoff

Metric graph

diagram
REPAIR EFFECT

yield
  ^
  |      o pre-repair
  |             o post-repair
  +---------------------> lot

Reports and artifacts

  • MBIST insertion coverage

  • repair signature report

  • LBIST resistant fault list

  • BIST release checklist

Mini case study

Fuse programming mismatch blocked repair activation; corrected bring-up script recovered expected yield uplift.

Debug branches

  • Validate BIST reachability

  • Correlate fail maps to repair signatures

  • Audit in-field boot test budget

Senior review question

Ask: what evidence proves this DFT decision is safe for production?

Key takeaways

  • State metric, lot/corner context, and pattern tag with every claim.

  • Treat timing, power, and quality as one signoff problem.

Common pitfalls

  • Chasing coverage without legality checks.

  • Ignoring test-power side effects of pattern changes.

  • Debugging silicon without reproducible tags.

Principal DFT review addendum

BIST signoff verifies architecture correctness, quality targets, safety intent, and production programmability before release.

Metric: MBIST/LBIST pass criteria, startup test time, in-field diagnostic readiness