STA Mastery · All levels

I/O Timing & Boundary Contracts: Silicon PPA Impact

Silicon PPA Impact for I/O Timing & Boundary Contracts.

Silicon PPA and closure impact

Clock trees, uncertainty, and IO modeling drive CTS and package work.

Area drivers

  • Upsize cells

  • Buffer insertion

  • Shield wires

Power drivers

  • VT swap leakage

  • Clock tree power for skew

Timing impact

  • Net delay on critical routes

  • SI delta delay

PD consequences

  • Congestion limits sizing

  • Layer promotion for nets

Verification burden

  • ECO equivalence

  • SI re-signoff

diagram
PPA — I/O Timing & Boundary Contracts
area/power/timing/closure-time tradeoff

PPA takeaways

  • ECO has PPA cost

  • Signoff is multi-corner

Design option PPA snapshot

diagram
BEFORE / AFTER ECO — I/O Timing & Boundary Contracts

WNS (ps)
  0 |                    --- target
-50 |    ● regressed
-80 |         ● before ECO
-20 |              ● after ECO
    +-------------------------------> ECO iteration
Prove setup AND hold moved safely.

STA deep dive

SDC quality determines whether STA measures reality or fiction.

Concept diagram

diagram
SDC FLOW

RTL clocks -> create_clock / generated_clock
board      -> set_input/output_delay
exceptions -> false_path / multicycle (audited)
analysis   -> report_timing

Metric graph

diagram
CONSTRAINT QUALITY

audited exceptions  ████████████████  good
stale IO delays     ██████            risk
missing gen clock   ████              high escape

Reports and artifacts

  • clock report

  • uncertainty budget

  • IO delay coverage

  • exception audit log

Mini case study

1000 new failing paths overnight: SDC merge dropped a generated_clock on divider output. No PD change needed.

Debug branches

  • Diff SDC before ECO

  • Validate clocks on failing path

  • Audit false paths quarterly

Senior review question

Ask: what corner/mode/view proves this topic is closed or failing?

Key takeaways

  • State corner, mode, view, and database tag with every slack claim.

  • Run setup and hold plus MMMC regression after every ECO.

Common pitfalls

  • Comparing STA runs with different SPEF or SDC tags.

  • Broad false_path to green-wash violations.

  • Setup-only ECO without hold check.

Principal STA review addendum

set_input_delay and set_output_delay translate board and pad timing into the block boundary so internal STA matches system timing.

Metric: interface setup/hold WNS, input/output delay coverage, port slack