STA Mastery · All levels

I/O Timing & Boundary Contracts: Step-by-Step Walkthrough

Step-by-Step Walkthrough for I/O Timing & Boundary Contracts.

Step-by-step analysis walkthrough

Use when you own I/O Timing & Boundary Contracts in a timing war room.

  1. Open signoff scenario list — note worst WNS corner.

  2. report_timing -max/-min on failing group.

  3. Trace launch and capture clocks on critical path.

  4. Check exceptions and generated clocks on path.

  5. Break down cell vs net delay.

  6. Compare implementation vs signoff view if delta suspicious.

  7. Assign owner: RTL, synth, PD, CTS, SI.

  8. Propose ECO with hold/SI check plan.

  9. Run regression matrix.

  10. Update closure dashboard and memo.

Artifacts to collect

  • boundary SDC, board delay spreadsheet, report_timing on IO paths

  • SDC file

  • SPEF tag

  • MMMC scenario list

  • ECO ticket

Decision memo template

diagram
STA DECISION MEMO — I/O Timing & Boundary Contracts
corner/mode:
WNS/TNS:
hypothesis:
ECO:
regression:
owners: STA owner, package owner, system integration owner

Reference visuals

Input / output delay model

diagram
BOARD                    CHIP BOUNDARY              INTERNAL
  |                            |                          |
pad delay -- set_input_delay -> FF capture path analyzed by STA
internal launch -- set_output_delay -> pad delay -> board

IO constraints are the contract between system and block STA.

STA deep dive

SDC quality determines whether STA measures reality or fiction.

Concept diagram

diagram
SDC FLOW

RTL clocks -> create_clock / generated_clock
board      -> set_input/output_delay
exceptions -> false_path / multicycle (audited)
analysis   -> report_timing

Metric graph

diagram
CONSTRAINT QUALITY

audited exceptions  ████████████████  good
stale IO delays     ██████            risk
missing gen clock   ████              high escape

Reports and artifacts

  • clock report

  • uncertainty budget

  • IO delay coverage

  • exception audit log

Mini case study

1000 new failing paths overnight: SDC merge dropped a generated_clock on divider output. No PD change needed.

Debug branches

  • Diff SDC before ECO

  • Validate clocks on failing path

  • Audit false paths quarterly

Senior review question

Ask: what corner/mode/view proves this topic is closed or failing?

Key takeaways

  • State corner, mode, view, and database tag with every slack claim.

  • Run setup and hold plus MMMC regression after every ECO.

Common pitfalls

  • Comparing STA runs with different SPEF or SDC tags.

  • Broad false_path to green-wash violations.

  • Setup-only ECO without hold check.

Principal STA review addendum

set_input_delay and set_output_delay translate board and pad timing into the block boundary so internal STA matches system timing.

Metric: interface setup/hold WNS, input/output delay coverage, port slack