Comparison matrix

Path group and optimization focus determine closure efficiency.

diagram
+------------------+----------------+----------------+----------------+
| Approach         | Strength       | Weakness       | Best when      |
+------------------+----------------+----------------+----------------+
| Conservative     | safe           | slow closure   | risk-averse    |
| Balanced         | practical      | needs discipline | production     |
| Aggressive       | fast           | regression risk | tapeout crunch |
| RTL change       | structural     | long loop      | architectural  |
+------------------+----------------+----------------+----------------+

When to choose each approach

  • Match approach to schedule and silicon risk

Interview traps

  • One-size ECO playbook

  • Ignoring hold

Evidence comparison

diagram
STA EVIDENCE MATRIX — Cell vs Net Delay Budgets

+-------------------+------------------------+--------------------------+-------------------------+
| Evidence           | Tells you              | Does not prove           | Next action             |
+-------------------+------------------------+--------------------------+-------------------------+
| report_timing      | critical path slack    | root cause class         | cell vs net split       |
| clock report       | clock reachability     | path delay               | fix generated_clock     |
| SDC diff           | constraint change      | physical delay           | re-run all scenarios    |
| SPEF tag compare   | parasitic view         | constraint quality       | isolate view mismatch   |
| MMMC dashboard     | worst scenario         | single-path fix          | assign path group owner |
+-------------------+------------------------+--------------------------+-------------------------+

STA deep dive

Slack is a path story — read the graph, not just the number.

Concept diagram

diagram
TIMING GRAPH

FF --cell-- logic --net-- logic --cell-- FF
launch                              capture

Metric graph

diagram
SLACK TAIL

paths |    ***
      |  *******
      |*********  <- fix WNS first

Reports and artifacts

  • WNS/TNS

  • path slack histogram

  • cell vs net %

  • path group summary

Mini case study

WNS -90ps but 80% net delay on one congested route — PD route fix beat upsizing three cells.

Debug branches

  • Cell-heavy -> sizing/VT

  • Net-heavy -> route/layer

  • Check launch/capture clocks

Senior review question

Ask: what corner/mode/view proves this topic is closed or failing?

Key takeaways

  • State corner, mode, view, and database tag with every slack claim.

  • Run setup and hold plus MMMC regression after every ECO.

Common pitfalls

  • Comparing STA runs with different SPEF or SDC tags.

  • Broad false_path to green-wash violations.

  • Setup-only ECO without hold check.

Principal STA review addendum

Path delay splits between library cell arcs and interconnect parasitics; implementation fixes target the dominant contributor.

Metric: cell delay %, net delay %, high fanout net count, transition violations