STA Mastery · All levels

Cell vs Net Delay Budgets: Worked Example

Worked Example for Cell vs Net Delay Budgets.

Worked example

Worked Example for Cell vs Net Delay Budgets focuses on cell delay %, net delay %, high fanout net count, transition violations. The goal is to connect the observable symptom to timing mechanism, ownership, and regression risk.

A signoff run shows cell delay %, net delay %, high fanout net count, transition violations. The first review mistake is to blame implementation without checking constraints. A better review starts by pinning one critical path, proving where slack was lost, and checking whether the SDC rule is correct for Cell vs Net Delay Budgets.

Sequence under inspection

diagram
TIMING PATH — Cell vs Net Delay Budgets

launch FF --logic stages--> capture FF
     |                           |
  launch clock                capture clock
     |                           |
  required: arrival < capture_edge - setup
  metric: cell delay %, net delay %, high fanout net count, transition violations

Delay breakdown bar

diagram
PATH DELAY BREAKDOWN

cell delay  ████████████████  62%
net delay   ██████████        38%

If net-heavy -> routing/RC fix.
If cell-heavy -> sizing/VT/upsize.
  1. Capture report_timing and the relevant SDC excerpt.

  2. Tag corner, mode, view, and path group.

  3. Find the first cell or net that dominates critical delay.

  4. Compare against report_timing -cap -tran -nets, delay breakdown report, RC extraction log.

  5. Choose one reversible ECO and write the regression matrix before editing netlist or constraints.

Did the fix work?

diagram
BEFORE / AFTER ECO — Cell vs Net Delay Budgets

WNS (ps)
  0 |                    --- target
-50 |    ● regressed
-80 |         ● before ECO
-20 |              ● after ECO
    +-------------------------------> ECO iteration
Prove setup AND hold moved safely.

STA deep dive

Slack is a path story — read the graph, not just the number.

Concept diagram

diagram
TIMING GRAPH

FF --cell-- logic --net-- logic --cell-- FF
launch                              capture

Metric graph

diagram
SLACK TAIL

paths |    ***
      |  *******
      |*********  <- fix WNS first

Reports and artifacts

  • WNS/TNS

  • path slack histogram

  • cell vs net %

  • path group summary

Mini case study

WNS -90ps but 80% net delay on one congested route — PD route fix beat upsizing three cells.

Debug branches

  • Cell-heavy -> sizing/VT

  • Net-heavy -> route/layer

  • Check launch/capture clocks

Senior review question

Ask: what corner/mode/view proves this topic is closed or failing?

Key takeaways

  • State corner, mode, view, and database tag with every slack claim.

  • Run setup and hold plus MMMC regression after every ECO.

Common pitfalls

  • Comparing STA runs with different SPEF or SDC tags.

  • Broad false_path to green-wash violations.

  • Setup-only ECO without hold check.

Principal STA review addendum

Path delay splits between library cell arcs and interconnect parasitics; implementation fixes target the dominant contributor.

Metric: cell delay %, net delay %, high fanout net count, transition violations