ECO Physical vs Logical: Expanded Case Study
Expanded Case Study for ECO Physical vs Logical.
Extended case study
Signoff review: ECO turnaround time, leakage delta, area delta, timing recovery fails after an apparently minor change affecting ECO Physical vs Logical.
Background
Team had closure last week on full MMMC matrix. New run shows regression clustered in one path group.
Symptoms observed
ECO turnaround time, leakage delta, area delta, timing recovery regression
Disagreement between synth and STA WNS
Hold violations after setup ECO
Investigation timeline
Hour 0: freeze netlist, SDC, SPEF, lib tags
Hour 1: diff constraints and run manifest
Hour 2: isolate corner/mode that fails
Hour 3: read worst path — cell vs net, clocks
Hour 4: classify root cause
Hour 5: minimal ECO or SDC fix
Hour 6: full regression + signoff memo
Root cause
Root cause tied to ECO Physical vs Logical: Logical ECO changes netlist; physical ECO changes placement/routing; each has different cost, risk, and regression surface.
Fix and validation
Bounded ECO or audited SDC change
Re-run ECO ticket, LEF/DEF delta, netlist diff, timing before/after
Full MMMC + SI regression
Lessons learned
Tag every run
Diff constraints before blaming PD
Setup and hold together
CASE STUDY — ECO Physical vs Logical
baseline WNS / regressed WNS / post-fix WNSSequence under stress
TIMING PATH — ECO Physical vs Logical
launch FF --logic stages--> capture FF
| |
launch clock capture clock
| |
required: arrival < capture_edge - setup
metric: ECO turnaround time, leakage delta, area delta, timing recoverySTA deep dive
ECO without regression is a coin flip.
Concept diagram
ECO LOOP
failing path -> fix -> setup check -> hold check -> SI -> MMMC matrixMetric graph
ECO PROGRESS
WNS
0 | o target
-50| o
-100| o baseline
+-----------------> ECO #Reports and artifacts
pre/post WNS
hold delta
leakage delta
ECO ticket log
Mini case study
48-hour tapeout crunch: VT swap fixed setup; hold fixed with route on short path — order mattered.
Debug branches
Never ship setup-only proof
Logical ECO needs equivalence
Senior review question
Ask: what corner/mode/view proves this topic is closed or failing?
Key takeaways
State corner, mode, view, and database tag with every slack claim.
Run setup and hold plus MMMC regression after every ECO.
Common pitfalls
Comparing STA runs with different SPEF or SDC tags.
Broad false_path to green-wash violations.
Setup-only ECO without hold check.
Principal STA review addendum
Logical ECO changes netlist; physical ECO changes placement/routing; each has different cost, risk, and regression surface.
Metric: ECO turnaround time, leakage delta, area delta, timing recovery