STA Mastery · All levels

ECO Physical vs Logical: Comparison Matrix

Comparison Matrix for ECO Physical vs Logical.

Comparison matrix

Logical vs physical ECO differ in cost, risk, and turnaround.

diagram
+------------------+----------------+----------------+----------------+
| Approach         | Strength       | Weakness       | Best when      |
+------------------+----------------+----------------+----------------+
| Conservative     | safe           | slow closure   | risk-averse    |
| Balanced         | practical      | needs discipline | production     |
| Aggressive       | fast           | regression risk | tapeout crunch |
| RTL change       | structural     | long loop      | architectural  |
+------------------+----------------+----------------+----------------+

When to choose each approach

  • Match approach to schedule and silicon risk

Interview traps

  • One-size ECO playbook

  • Ignoring hold

Evidence comparison

diagram
STA EVIDENCE MATRIX — ECO Physical vs Logical

+-------------------+------------------------+--------------------------+-------------------------+
| Evidence           | Tells you              | Does not prove           | Next action             |
+-------------------+------------------------+--------------------------+-------------------------+
| report_timing      | critical path slack    | root cause class         | cell vs net split       |
| clock report       | clock reachability     | path delay               | fix generated_clock     |
| SDC diff           | constraint change      | physical delay           | re-run all scenarios    |
| SPEF tag compare   | parasitic view         | constraint quality       | isolate view mismatch   |
| MMMC dashboard     | worst scenario         | single-path fix          | assign path group owner |
+-------------------+------------------------+--------------------------+-------------------------+

STA deep dive

ECO without regression is a coin flip.

Concept diagram

diagram
ECO LOOP

failing path -> fix -> setup check -> hold check -> SI -> MMMC matrix

Metric graph

diagram
ECO PROGRESS

WNS
 0 |              o target
-50|        o
-100|   o baseline
    +-----------------> ECO #

Reports and artifacts

  • pre/post WNS

  • hold delta

  • leakage delta

  • ECO ticket log

Mini case study

48-hour tapeout crunch: VT swap fixed setup; hold fixed with route on short path — order mattered.

Debug branches

  • Never ship setup-only proof

  • Logical ECO needs equivalence

Senior review question

Ask: what corner/mode/view proves this topic is closed or failing?

Key takeaways

  • State corner, mode, view, and database tag with every slack claim.

  • Run setup and hold plus MMMC regression after every ECO.

Common pitfalls

  • Comparing STA runs with different SPEF or SDC tags.

  • Broad false_path to green-wash violations.

  • Setup-only ECO without hold check.

Principal STA review addendum

Logical ECO changes netlist; physical ECO changes placement/routing; each has different cost, risk, and regression surface.

Metric: ECO turnaround time, leakage delta, area delta, timing recovery