STA Mastery · All levels

ECO Physical vs Logical: Silicon PPA Impact

Silicon PPA Impact for ECO Physical vs Logical.

Silicon PPA and closure impact

Sizing, VT, skew, and route each have PPA side effects.

Area drivers

  • Upsize cells

  • Buffer insertion

  • Shield wires

Power drivers

  • VT swap leakage

  • Clock tree power for skew

Timing impact

  • Net delay on critical routes

  • SI delta delay

PD consequences

  • Congestion limits sizing

  • Layer promotion for nets

Verification burden

  • ECO equivalence

  • SI re-signoff

diagram
PPA — ECO Physical vs Logical
area/power/timing/closure-time tradeoff

PPA takeaways

  • ECO has PPA cost

  • Signoff is multi-corner

Design option PPA snapshot

diagram
BEFORE / AFTER ECO — ECO Physical vs Logical

WNS (ps)
  0 |                    --- target
-50 |    ● regressed
-80 |         ● before ECO
-20 |              ● after ECO
    +-------------------------------> ECO iteration
Prove setup AND hold moved safely.

STA deep dive

ECO without regression is a coin flip.

Concept diagram

diagram
ECO LOOP

failing path -> fix -> setup check -> hold check -> SI -> MMMC matrix

Metric graph

diagram
ECO PROGRESS

WNS
 0 |              o target
-50|        o
-100|   o baseline
    +-----------------> ECO #

Reports and artifacts

  • pre/post WNS

  • hold delta

  • leakage delta

  • ECO ticket log

Mini case study

48-hour tapeout crunch: VT swap fixed setup; hold fixed with route on short path — order mattered.

Debug branches

  • Never ship setup-only proof

  • Logical ECO needs equivalence

Senior review question

Ask: what corner/mode/view proves this topic is closed or failing?

Key takeaways

  • State corner, mode, view, and database tag with every slack claim.

  • Run setup and hold plus MMMC regression after every ECO.

Common pitfalls

  • Comparing STA runs with different SPEF or SDC tags.

  • Broad false_path to green-wash violations.

  • Setup-only ECO without hold check.

Principal STA review addendum

Logical ECO changes netlist; physical ECO changes placement/routing; each has different cost, risk, and regression surface.

Metric: ECO turnaround time, leakage delta, area delta, timing recovery