ECO Physical vs Logical: Step-by-Step Walkthrough
Step-by-Step Walkthrough for ECO Physical vs Logical.
Step-by-step analysis walkthrough
Use when you own ECO Physical vs Logical in a timing war room.
Open signoff scenario list — note worst WNS corner.
report_timing -max/-min on failing group.
Trace launch and capture clocks on critical path.
Check exceptions and generated clocks on path.
Break down cell vs net delay.
Compare implementation vs signoff view if delta suspicious.
Assign owner: RTL, synth, PD, CTS, SI.
Propose ECO with hold/SI check plan.
Run regression matrix.
Update closure dashboard and memo.
Artifacts to collect
ECO ticket, LEF/DEF delta, netlist diff, timing before/after
SDC file
SPEF tag
MMMC scenario list
ECO ticket
Decision memo template
STA DECISION MEMO — ECO Physical vs Logical
corner/mode:
WNS/TNS:
hypothesis:
ECO:
regression:
owners: PD owner, RTL owner, STA ownerReference visuals
ECO types
LOGICAL ECO PHYSICAL ECO
netlist change place/route change
synthesis-driven PD-driven
faster for logic fix faster for wire fix
re-verify equivalence re-extract SPEFSTA deep dive
ECO without regression is a coin flip.
Concept diagram
ECO LOOP
failing path -> fix -> setup check -> hold check -> SI -> MMMC matrixMetric graph
ECO PROGRESS
WNS
0 | o target
-50| o
-100| o baseline
+-----------------> ECO #Reports and artifacts
pre/post WNS
hold delta
leakage delta
ECO ticket log
Mini case study
48-hour tapeout crunch: VT swap fixed setup; hold fixed with route on short path — order mattered.
Debug branches
Never ship setup-only proof
Logical ECO needs equivalence
Senior review question
Ask: what corner/mode/view proves this topic is closed or failing?
Key takeaways
State corner, mode, view, and database tag with every slack claim.
Run setup and hold plus MMMC regression after every ECO.
Common pitfalls
Comparing STA runs with different SPEF or SDC tags.
Broad false_path to green-wash violations.
Setup-only ECO without hold check.
Principal STA review addendum
Logical ECO changes netlist; physical ECO changes placement/routing; each has different cost, risk, and regression surface.
Metric: ECO turnaround time, leakage delta, area delta, timing recovery