ECO Physical vs Logical: Worked Example
Worked Example for ECO Physical vs Logical.
Worked example
Worked Example for ECO Physical vs Logical focuses on ECO turnaround time, leakage delta, area delta, timing recovery. The goal is to connect the observable symptom to timing mechanism, ownership, and regression risk.
A signoff run shows ECO turnaround time, leakage delta, area delta, timing recovery. The first review mistake is to blame implementation without checking constraints. A better review starts by pinning one critical path, proving where slack was lost, and checking whether the SDC rule is correct for ECO Physical vs Logical.
Sequence under inspection
TIMING PATH — ECO Physical vs Logical
launch FF --logic stages--> capture FF
| |
launch clock capture clock
| |
required: arrival < capture_edge - setup
metric: ECO turnaround time, leakage delta, area delta, timing recoveryECO types
LOGICAL ECO PHYSICAL ECO
netlist change place/route change
synthesis-driven PD-driven
faster for logic fix faster for wire fix
re-verify equivalence re-extract SPEFCapture report_timing and the relevant SDC excerpt.
Tag corner, mode, view, and path group.
Find the first cell or net that dominates critical delay.
Compare against ECO ticket, LEF/DEF delta, netlist diff, timing before/after.
Choose one reversible ECO and write the regression matrix before editing netlist or constraints.
Did the fix work?
BEFORE / AFTER ECO — ECO Physical vs Logical
WNS (ps)
0 | --- target
-50 | ● regressed
-80 | ● before ECO
-20 | ● after ECO
+-------------------------------> ECO iteration
Prove setup AND hold moved safely.STA deep dive
ECO without regression is a coin flip.
Concept diagram
ECO LOOP
failing path -> fix -> setup check -> hold check -> SI -> MMMC matrixMetric graph
ECO PROGRESS
WNS
0 | o target
-50| o
-100| o baseline
+-----------------> ECO #Reports and artifacts
pre/post WNS
hold delta
leakage delta
ECO ticket log
Mini case study
48-hour tapeout crunch: VT swap fixed setup; hold fixed with route on short path — order mattered.
Debug branches
Never ship setup-only proof
Logical ECO needs equivalence
Senior review question
Ask: what corner/mode/view proves this topic is closed or failing?
Key takeaways
State corner, mode, view, and database tag with every slack claim.
Run setup and hold plus MMMC regression after every ECO.
Common pitfalls
Comparing STA runs with different SPEF or SDC tags.
Broad false_path to green-wash violations.
Setup-only ECO without hold check.
Principal STA review addendum
Logical ECO changes netlist; physical ECO changes placement/routing; each has different cost, risk, and regression surface.
Metric: ECO turnaround time, leakage delta, area delta, timing recovery