Physical Design · All levels
CTS Goals: Skew, Latency, and Transition — Review Checklist
Review Checklist for CTS Goals: Skew, Latency, and Transition (Clock Tree Synthesis).
Review gate
Per-domain skew and latency targets are documented and mode-aware.
Clock transition and capacitance limits are within technology constraints.
Violating sink clusters are physically explainable and tracked.
Power impact of CTS buffering remains within budget.
Post-change verification includes setup and hold sanity.
Smoke check (5 minutes)
Every checklist item has an owner
Failed items have mitigation or waiver ID
Definition of done for a senior owner
The exact database tag and analysis setup are recorded.
The primary metric is clean or accepted by waiver: Clock Tree Synthesis closure dashboard.
The fix is explained by mechanism, not by tool folklore.
Regression coverage includes the obvious downstream domains: Routing reserve strategy and hold-fixing burden depend on this objective setup..
Residual risk has an owner, approval path, and expiration date.
The lesson is captured as a methodology guardrail if it can recur.
Smoke check (5 minutes)
Could another engineer reproduce the conclusion from the notes alone?
Would you sign this off if the design came from another team?
Deep dive: how this shows up in real closure
CTS changes the timing problem by making clocks real.
Reports and artifacts to inspect
clock tree summary: skew, latency, buffer count, sink count
clock transition and capacitance violations
post-CTS setup/hold WNS by clock domain
ICG enable timing and test-mode clock exceptions
Mini case study
Pre-CTS setup is green, but post-CTS hold WNS is -60 ps on short register-to-register paths. This is expected: clock arrival spread is now real. Add data delay or adjust skew carefully, then check setup regression.
Debug branches
If skew is high, inspect clock root, macro stops, NDR, and buffer placement channels.
If hold explodes, classify short paths by domain and add targeted delay, not global padding.
If ICG enable fails, debug enable path timing separately from clock skew.
Senior review question
Ask yourself: what single report line would prove this page's concept is either passing or failing?
What changes at 10+ years
You are expected to predict what your fix can break before running it.
You should recognize when the issue is methodology, not one block's implementation.
You should communicate risk in tapeout language: owner, evidence, impact, mitigation, and decision date.
Principal-level review bar
Deep subpage pages in this course should be read like real closure review material. For a 10+ year PD engineer, the bar is not remembering terminology; it is making a release-quality decision under ambiguity.
What excellent looks like
Names the failing metric, corner/mode, database tag, and analysis switches before proposing a fix.
Separates data, constraint, physical, tool, and methodology root causes instead of treating all failures as optimization problems.
Chooses experiments by information gain and reversibility, not by habit.
States regression blast radius across timing, route, power, PV, DFT, package, and tapeout manifest.
Turns recurring failures into methodology guardrails, dashboards, or checklist items.
Closure note template
STAFF / PRINCIPAL CLOSURE NOTE
Context:
stage: <pre-CTS | post-CTS | post-route | post-fill | signoff>
tag: <database / netlist / SDC / library stack>
failing metric: <exact report line>
affected scope: <block / hierarchy / path group / power domain / region>
Hypotheses:
H1: <most likely physical or constraint mechanism>
H2: <competing explanation>
H3: <methodology or input-data issue>
Decision:
next experiment: <cheap check that can falsify H1>
fix candidate: <minimal reversible change>
rollback trigger: <metric that says the fix is wrong>
regression set: <timing / route / power / PV / DFT / package>
escalation owner: <team or reviewer>Tradeoffs a senior engineer must discuss
Technical tradeoff
CTS changes the timing problem by making clocks real. Explain not only the preferred fix, but what margin or schedule you are spending to get it.
Cross-team tradeoff
What must RTL, synthesis, CAD, STA, DFT, package, IP, or foundry agree to before this decision is final?
Which artifact becomes the source of truth after the decision: report, waiver, manifest, ECO script, or methodology deck?
What is the cost of being wrong: one rerun, ECO churn, mask risk, performance loss, or silicon escape?
Leadership communication
"The current blocker is <metric> in <corner/mode/stage>. The leading cause is <mechanism>. I recommend <fix> because it is bounded and reversible. The regression surface is <domains>. If it fails, we escalate to <owner> with <evidence>."Key takeaways
Always connect the concept back to a measurable signoff artifact.
A fix is not complete until you can name the regression checks.
Common pitfalls
Optimizing by habit instead of reading the current report.
Forgetting that a local fix can regress timing, routing, power, or PV elsewhere.