STA Mastery · All levels

Exceptions & Audit Policy: Reports & Metrics

Reports & Metrics for Exceptions & Audit Policy.

Reports and metrics

Reports & Metrics for Exceptions & Audit Policy focuses on false path count, multicycle path audit rate, exception waiver backlog. The goal is to connect the observable symptom to timing mechanism, ownership, and regression risk.

The job of a report is to turn false path count, multicycle path audit rate, exception waiver backlog into a closure decision. A single WNS number is almost never enough; you need path group breakdown, cell vs net split, and a clear gap between current slack and signoff target.

Metric movement

diagram
METRIC GRAPH — false path count, multicycle path audit rate, exception waiver backlog

WNS (ps)
  ^
  |                         target (0)
  |                       - - - - - - -
  |                  o after ECO + hold check
  |              o
  |         o baseline run
  |    o failing regression
  +--------------------------------------> closure iteration
    view audit     path group fix     MMMC signoff

Readout:
  - explain why WNS/TNS moved and which path group drove the change

Slack distribution

diagram
SLACK HISTOGRAM — Exceptions & Audit Policy

path count
  |      ***
  |    *******
  |  ***********
  |*************  <- WNS (worst path)
  +--------------------> slack (ns)
  -0.15  0.0  0.10

Fix the left tail first; average slack misleads.
  • Track false path count, multicycle path audit rate, exception waiver backlog by path group, corner, and analysis view.

  • Report WNS/TNS and failing endpoint count together.

  • Include setup and hold splits; they often diverge after ECO.

  • Always store the metric next to the artifact that produced it.

STA deep dive

SDC quality determines whether STA measures reality or fiction.

Concept diagram

diagram
SDC FLOW

RTL clocks -> create_clock / generated_clock
board      -> set_input/output_delay
exceptions -> false_path / multicycle (audited)
analysis   -> report_timing

Metric graph

diagram
CONSTRAINT QUALITY

audited exceptions  ████████████████  good
stale IO delays     ██████            risk
missing gen clock   ████              high escape

Reports and artifacts

  • clock report

  • uncertainty budget

  • IO delay coverage

  • exception audit log

Mini case study

1000 new failing paths overnight: SDC merge dropped a generated_clock on divider output. No PD change needed.

Debug branches

  • Diff SDC before ECO

  • Validate clocks on failing path

  • Audit false paths quarterly

Senior review question

Ask: what corner/mode/view proves this topic is closed or failing?

Key takeaways

  • State corner, mode, view, and database tag with every slack claim.

  • Run setup and hold plus MMMC regression after every ECO.

Common pitfalls

  • Comparing STA runs with different SPEF or SDC tags.

  • Broad false_path to green-wash violations.

  • Setup-only ECO without hold check.

Reading reports