Every synthesis run trades area, power, and timing against each other. Tightening one constraint moves the other two, so a fair comparison states all three with EXAMPLE numbers.
Axis | What it measures | Stated EXAMPLE unit |
|---|---|---|
Area | Cell count times cell size in the teaching library. | Library units of course.lib. |
Power | Dynamic plus leakage at stated activity and voltage. | Milliwatts at stated alpha, C, V, f. |
Timing | Delay against the clock target, read as slack. | Nanoseconds of EXAMPLE delay. |
Lesson | What it covers |
|---|---|
How one constraint change moves area, power, and timing together. | |
P = alpha C V squared f with exact EXAMPLE arithmetic and a checker. | |
Leakage at concept level, Vt mixing, and leakage recovery. | |
What faster cells and duplicated cones cost in area and power. | |
Fixing two axes, comparing the third, and dropping dominated runs. |
Undecided until the budget is stated. B leads on two axes, but if power is the binding constraint, B still fails.