Interface Protocols · All levels

Compliance & Coverage Plan: Inputs & Outputs

Inputs & Outputs for Compliance & Coverage Plan.

Inputs and outputs contract

Inputs & Outputs for Compliance & Coverage Plan focuses on spec feature coverage, compliance pass rate, waiver count. The goal is to connect the observable symptom to protocol mechanism, ownership, and regression risk.

Treat these as a signed interface contract. Ambiguity here is the single biggest source of wasted integration weeks, because two teams debug against different assumptions.

diagram
INPUTS
  - protocol spec revision and feature subset
  - clock/reset assumptions
  - address map, ID/tag width, ordering attributes
  - traffic class, QoS, firmware register settings

OUTPUTS
  - legal transaction trace
  - integration waiver list
  - VIP/compliance report
  - owner-signed debug or signoff note

Transaction sequence

diagram
SEQUENCE — Compliance & Coverage Plan

  initiator            interconnect/PHY            target
      |  request (id) ------->  |                     |
      |                         |  forward ----------> |
      |                         |                     | work
      |                         |  <---- response ---- |
      |  <----- complete ------ |                     |
      |
   metric captured here: spec feature coverage, compliance pass rate, waiver count

Ownership map

diagram
OWNERSHIP MAP — Compliance & Coverage Plan

evidence type        owner who reads it
-----------------    ---------------------------
waveform/RTL        verification lead
spec/VIP            IP owner
firmware/system     signoff owner

Rule: every metric must have a named owner before a review starts.

Protocol deep dive

Verification closes the gap between 'works in directed test' and 'legal under all stressed traffic'.

Concept diagram

diagram
VERIFICATION CLOSURE LOOP

spec clause -> test -> assertion -> coverage -> waiver -> signoff
                  ^                           |
                  +--------- gap found --------+

Metric graph

diagram
COVERAGE vs ESCAPE RATE

escapes
  |*
  | *
  |  *
  |   **  <- knee: more random helps
  |     ****
  +----------------> constrained-random depth

Metrics and artifacts to collect

  • compliance pass rate

  • coverage closure

  • scoreboard mismatch rate

  • assertion fire count

  • waiver log

Mini case study

Block passed VIP compliance but chip failed: system test omitted cross-master ID reuse through a bridge. Scoreboard key did not include upstream port ID.

Debug branches

  • If VIP pass but silicon fail, check integration assumptions.

  • If scoreboard noisy, fix key (ID+port+addr).

  • If coverage plateau, add compliance gap analysis not more repeats.

Senior review question

Ask: what is the first transaction that deviates, and which spec rule does it test?

Key takeaways

  • Connect every protocol claim to a transaction identity and measurable metric.

  • Store the artifact (waveform, log, counter) next to every signoff decision.

Common pitfalls

  • Debugging timeouts without finding the first bad transaction.

  • Quoting peak bus width without payload efficiency and retry overhead.

  • Treating VIP compliance as a substitute for system integration replay.

Principal review addendum

Re-read Compliance & Coverage Plan against one concrete product workload, not a synthetic directed test.

compliance maps spec requirements to tests, assertions, coverage bins, exclusions, and signed waivers.