Review Checklist for ECO Regression Matrix focuses on corners re-run, new violations introduced, signoff delta. The goal is to connect the observable symptom to timing mechanism, ownership, and regression risk.
SDC revision and implemented clock/exception policy are named.
Clock/reset and CDC assumptions are reviewed.
Path groups, IO delays, and exception rationale are documented.
MMMC scenario list maps back to signoff requirements.
WNS/TNS artifact stored with corner/mode/view tags.
Owners signed: STA lead, CAD owner, program lead.
OWNERSHIP MAP — ECO Regression Matrix
artifact owner
---------------- -----------------
timing report STA lead
SDC/constraint CAD owner
implementation program lead
Every WNS cluster needs a named owner before ECO.ECO without regression is a coin flip.
ECO LOOP
failing path -> fix -> setup check -> hold check -> SI -> MMMC matrixECO PROGRESS
WNS
0 | o target
-50| o
-100| o baseline
+-----------------> ECO #pre/post WNS
hold delta
leakage delta
ECO ticket log
48-hour tapeout crunch: VT swap fixed setup; hold fixed with route on short path — order mattered.
Never ship setup-only proof
Logical ECO needs equivalence
Ask: what corner/mode/view proves this topic is closed or failing?
State corner, mode, view, and database tag with every slack claim.
Run setup and hold plus MMMC regression after every ECO.
Comparing STA runs with different SPEF or SDC tags.
Broad false_path to green-wash violations.
Setup-only ECO without hold check.
Every ECO must re-run the agreed MMMC matrix plus SI; regression hygiene prevents shipping a fix that breaks another corner.
Metric: corners re-run, new violations introduced, signoff delta