Skip to lesson

Course contents

  • How to Use This Course
  • Reading Path
  • STA Glossary
  • STA Metrics Reference
  • STA Mastery Cheatsheet
  • Timing Paths and Checks16
  • Constraints & SDC Fundamentals81
  • Delay Graph & Path Analysis77
  • Beyond Setup and Hold16
  • Multi-Corner Multi-Mode Signoff77
  • OCV, AOCV, POCV and Variation77
  • Crosstalk and Noise77
  • ECO and Closure77
    • Setup and Hold Closure Order
    • Physical vs Logical ECOs
    • Useful Skew Trade-offs
    • ECO Regression Matrix
      • What to Rerun
      • Regression Matrix Design
      • Avoiding Fix Breaks Fix
      • Closure Dashboards
      • ECO Regression Matrix: Mechanism
      • ECO Regression Matrix: Inputs & Outputs
      • ECO Regression Matrix: Reports & Metrics
      • ECO Regression Matrix: Debug Playbook
      • ECO Regression Matrix: Worked Example
      • ECO Regression Matrix: Pitfalls & Red Flags
      • ECO Regression Matrix: Interview Drills
      • ECO Regression Matrix: Review Checklist
      • ECO Regression Matrix: Theory Deep Dive
      • ECO Regression Matrix: Design Space
      • ECO Regression Matrix: Expanded Case Study
      • ECO Regression Matrix: Step-by-Step Walkthrough
      • ECO Regression Matrix: Comparison Matrix
      • ECO Regression Matrix: Software / Programmer View
      • ECO Regression Matrix: Silicon PPA Impact
    • ECO Timing Closure: Tricky Q&A
  • STA Debug Playbook77
  • STA Interview Prep26
  • Capstone Timing Signoff Lab4
Loading lesson

‹ECO Regression Matrix
  1. Topics
  2. Static Timing Analysis
  3. ECO and Closure
  4. ECO Regression Matrix
  5. ECO Regression Matrix: Worked Example

STA Mastery · All levels

ECO Regression Matrix: Worked Example

Worked Example for ECO Regression Matrix.

On this page

    Worked example

    Worked Example for ECO Regression Matrix focuses on corners re-run, new violations introduced, signoff delta. The goal is to connect the observable symptom to timing mechanism, ownership, and regression risk.

    A signoff run shows corners re-run, new violations introduced, signoff delta. The first review mistake is to blame implementation without checking constraints. A better review starts by pinning one critical path, proving where slack was lost, and checking whether the SDC rule is correct for ECO Regression Matrix.

    Sequence under inspection

    Diagram
    TIMING PATH — ECO Regression Matrix
    
    launch FF --logic stages--> capture FF
         |                           |
      launch clock                capture clock
         |                           |
      required: arrival < capture_edge - setup
      metric: corners re-run, new violations introduced, signoff delta

    Post-ECO regression

    Diagram
    ECO REGRESSION CHECKLIST
    [ ] all MMMC scenarios
    [ ] SI re-run
    [ ] power/leakage delta
    [ ] equivalence / LVS if logical ECO
    [ ] signoff memo updated
    1. Capture report_timing and the relevant SDC excerpt.

    2. Tag corner, mode, view, and path group.

    3. Find the first cell or net that dominates critical delay.

    4. Compare against regression manifest, corner comparison table, signoff approval.

    5. Choose one reversible ECO and write the regression matrix before editing netlist or constraints.

    Did the fix work?

    Diagram
    BEFORE / AFTER ECO — ECO Regression Matrix
    
    WNS (ps)
      0 |                    --- target
    -50 |    ● regressed
    -80 |         ● before ECO
    -20 |              ● after ECO
        +-------------------------------> ECO iteration
    Prove setup AND hold moved safely.

    STA deep dive

    ECO without regression is a coin flip.

    Concept diagram

    Diagram
    ECO LOOP
    
    failing path -> fix -> setup check -> hold check -> SI -> MMMC matrix

    Metric graph

    Diagram
    ECO PROGRESS
    
    WNS
     0 |              o target
    -50|        o
    -100|   o baseline
        +-----------------> ECO #

    Reports and artifacts

    • pre/post WNS

    • hold delta

    • leakage delta

    • ECO ticket log

    Mini case study

    48-hour tapeout crunch: VT swap fixed setup; hold fixed with route on short path — order mattered.

    Debug branches

    • Never ship setup-only proof

    • Logical ECO needs equivalence

    Senior review question

    Ask: what corner/mode/view proves this topic is closed or failing?

    Key takeaways

    • State corner, mode, view, and database tag with every slack claim.

    • Run setup and hold plus MMMC regression after every ECO.

    Common pitfalls

    • Comparing STA runs with different SPEF or SDC tags.

    • Broad false_path to green-wash violations.

    • Setup-only ECO without hold check.

    Principal STA review addendum

    Every ECO must re-run the agreed MMMC matrix plus SI; regression hygiene prevents shipping a fix that breaks another corner.

    Metric: corners re-run, new violations introduced, signoff delta

    This content block can't be displayed here.

    Block type: unknown

    This content block can't be displayed here.

    Block type: unknown

    This content block can't be displayed here.

    Block type: unknown

    Previous

    538 / 610

    Next: ECO Regression Matrix: Pitfalls & Red Flags

    Up next

    Up nextECO Regression Matrix: Pitfalls & Red Flags

    Sign in to save progress

    Practice this lessonReport an error

    See also

    • What to Rerun
    • Regression Matrix Design
    • Avoiding Fix Breaks Fix