Skip to lesson

Course contents

  • Architecture Metrics Reference
  • Workload Taxonomy for Architects
  • Architecture Glossary
  • Computer Architecture Cheatsheet
  • Pipeline Fundamentals14
  • Memory Hierarchy15
  • NoC and Interconnect Architecture6
  • Coherency and Memory Ordering9
  • Performance Analysis9
  • Accelerator Architectures6
  • SoC Architecture Tradeoffs9
    • PPA at System Level
      • PPA Budget Ledger
      • Workload-Weighted Model
      • Floorplan-Aware Budgets
      • Budget Negotiation
      • Architecture Signoff
    • Power and Energy for the Architect
  • Architecture Interview Prep14
Loading lesson

‹PPA at System Level
  1. Topics
  2. Computer Architecture
  3. SoC Architecture Tradeoffs
  4. PPA at System Level
  5. Architecture Signoff

Computer Architecture · All levels

Architecture Signoff

Sign off only on validated assumptions with owned risks, waivers and milestone gates.

On this page

    Assumption to evidence matrix

    Signoff maps each assumption to evidence and a threshold. The scorecard below is illustrative.

    Item

    Count

    Gate

    Assumptions validated

    39 of 46

    84.8%, 7 open

    High-risk items open

    4

    each with owner and date

    Blockers

    2

    DVFS margin model, NoC repartition

    Diagram
    Readiness fraction (illustrative)
      validated = 39 / 46 = 0.8478 -> 84.8%
      open = 46 - 39 = 7 assumptions
      with 4 high-risk open and 2 blockers, the gate reads CONDITIONAL

    Review judges evidence completeness, not document completeness. A thick package with unproven assumptions still waits.

    Conditional versus blocked

    The gate has three outcomes. Full validation with no open high risk passes, open items with containment go conditional, and expired waivers block.

    State

    Meaning

    Next step

    Pass

    all assumptions proven, no open high risk

    freeze and proceed

    Conditional

    open items with owner, date and containment

    track to closure at the next review

    Blocked

    a waiver expired or containment is missing

    stop and re-plan

    Common mistakes

    Common pitfall

    Treating a conditional approval as final dissolves every obligation it recorded. Each condition keeps its owner and expiry, and expiry without closure blocks the next gate.

    Interview

    Likely probes: signoff judgment.

    • Separate a review of ideas from a commitment to owned budgets.

    • Handle open high risk with containment, owner and deadline.

    • Require independent PD, power, timing and verification input.

    Check yourself 39 of 46 assumptions are validated with 4 high-risk items open. What is the gate outcome?

    Conditional: 84.8% validated with owned open items and containment to track.

    Check yourself A waiver expires with its risk still open. What is the gate outcome?

    Blocked, until the risk is contained or re-waived with a new owner and date.

    Testbench

    The model below encodes the gate rule over validated counts and waiver state. It checks gate logic, not the evidence itself.

    signoff_gate.sv
    1
    2
    3
    4
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16
    module signoff_gate (
      input  logic [7:0] validated,
      input  logic [7:0] total,
      input  logic [7:0] high_risk_open,
      input  logic       waiver_expired,
      output logic [1:0] status
    );
      localparam logic [1:0] ST_PASS = 2'd0;
      localparam logic [1:0] ST_COND = 2'd1;
      localparam logic [1:0] ST_BLOCK = 2'd2;
      always_comb begin
        if (waiver_expired) status = ST_BLOCK;
        else if ((validated == total) && (high_risk_open == 8'd0)) status = ST_PASS;
        else status = ST_COND;
      end
    endmodule
    

    Related topics

    • Architecture interview bank

    • SoC course

    Previous

    68 / 86

    Next: Power and Energy for the Architect

    Up next

    Up nextPower and Energy for the Architect

    Sign in to save progress

    Practice this lessonReport an error