Review Checklist for Shift vs Capture Timing focuses on shift hold violations, capture setup failures, at-speed pattern pass rate. The goal is to convert metric movement into mechanism, owner, and release decision.
Run tags and scenario context are explicit.
Constraints and legality assumptions are documented.
Quality, timing, and test-power checks are included.
Diagnosis evidence supports residual-risk decision.
Owners signed: STA owner, DFT owner, PD owner.
OWNERSHIP MAP - Shift vs Capture Timing
artifact owner
---------------- -----------------
architecture/report STA owner
constraints/setup DFT owner
physical/test PD owner
Name an owner for each failing metric cluster.Test signoff fails when shift/capture timing and test power are treated independently.
TEST SIGNOFF LOOP
test SDC -> shift/capture timing -> power-aware ATPG -> IR validation -> releaseTEST CURRENT
functional current baseline
scan shift current peak-risk zonetest-mode STA report
shift/capture split
test power IR map
waiver tracker
At-speed patterns passed timing but failed in production due to peak shift IR; staggered capture and power-aware fill resolved.
Tag test and functional corners separately
Check hold in shift mode
Correlate fail bins with power hotspots
Ask: what evidence proves this DFT decision is safe for production?
State metric, lot/corner context, and pattern tag with every claim.
Treat timing, power, and quality as one signoff problem.
Chasing coverage without legality checks.
Ignoring test-power side effects of pattern changes.
Debugging silicon without reproducible tags.
Shift mode is hold-sensitive while capture mode is setup-sensitive; closure must preserve both under test clocking assumptions.
Metric: shift hold violations, capture setup failures, at-speed pattern pass rate