Inputs and outputs contract

Inputs & Outputs for Shift vs Capture Timing focuses on shift hold violations, capture setup failures, at-speed pattern pass rate. The goal is to convert metric movement into mechanism, owner, and release decision.

Treat these as a release contract. Ambiguity here creates expensive debug loops because teams optimize against different assumptions.

diagram
INPUTS
  - scan/ATPG architecture and constraints
  - fault model and quality target policy
  - pattern generation config + tester limits
  - timing/power/physical assumptions

OUTPUTS
  - quality metrics and closure status
  - signed artifacts and owner approvals
  - diagnosis evidence for residual risk
  - release, waiver, or escalation decision

Flow sequence

diagram
DFT FLOW - Shift vs Capture Timing

scan insertion -> chain stitch -> compression map -> ATPG -> tester apply -> diagnosis
      |                |                |            |             |
 controllability   shift balance    channel use   coverage     silicon correlation

Primary metric: shift hold violations, capture setup failures, at-speed pattern pass rate

Ownership map

diagram
OWNERSHIP MAP - Shift vs Capture Timing

artifact              owner
----------------      -----------------
architecture/report STA owner
constraints/setup   DFT owner
physical/test       PD owner

Name an owner for each failing metric cluster.

DFT deep dive

Test signoff fails when shift/capture timing and test power are treated independently.

Concept diagram

diagram
TEST SIGNOFF LOOP

test SDC -> shift/capture timing -> power-aware ATPG -> IR validation -> release

Metric graph

diagram
TEST CURRENT

functional current  baseline
scan shift current  peak-risk zone

Reports and artifacts

  • test-mode STA report

  • shift/capture split

  • test power IR map

  • waiver tracker

Mini case study

At-speed patterns passed timing but failed in production due to peak shift IR; staggered capture and power-aware fill resolved.

Debug branches

  • Tag test and functional corners separately

  • Check hold in shift mode

  • Correlate fail bins with power hotspots

Senior review question

Ask: what evidence proves this DFT decision is safe for production?

Key takeaways

  • State metric, lot/corner context, and pattern tag with every claim.

  • Treat timing, power, and quality as one signoff problem.

Common pitfalls

  • Chasing coverage without legality checks.

  • Ignoring test-power side effects of pattern changes.

  • Debugging silicon without reproducible tags.

Principal DFT review addendum

Shift mode is hold-sensitive while capture mode is setup-sensitive; closure must preserve both under test clocking assumptions.

Metric: shift hold violations, capture setup failures, at-speed pattern pass rate