Debug Playbook for Shift vs Capture Timing focuses on shift hold violations, capture setup failures, at-speed pattern pass rate. The goal is to convert metric movement into mechanism, owner, and release decision.
Debug aims to find the first incorrect assumption, not the loudest downstream symptom. Start with reproducibility and ownership.
ROOT-CAUSE TREE - Shift vs Capture Timing
shift hold violations, capture setup failures, at-speed pattern pass rate regresses
|
setup changed?
/ \
yes no
| |
constraint silicon or
or ATPG physical/test path
/ \ |
SDC model chain/clock/power/diagnosis
diff diff isolate first failing signatureFreeze run tags for patterns, constraints, and tester setup.
Isolate first failing metric bucket and scenario.
Classify failure source: model, constraints, physical, or silicon.
Prove mechanism with one reduced replay or targeted run.
Apply smallest owner-controlled fix.
Re-run timing, power, and quality regression matrix.
STAFF DFT REVIEW MEMO - Test Timing & Power / Shift vs Capture Timing
1. Symptom
- Watched metric: shift hold violations, capture setup failures, at-speed pattern pass rate
- Failing scenario: <mode/lot/corner/program>
- Pattern class: <scan/transition/compressed/BIST/JTAG>
- Tags: <constraints, patterns, tester program, netlist>
2. Mechanism hypothesis
- Primary mechanism: Shift mode is hold-sensitive while capture mode is setup-sensitive; closure must preserve both under test clocking assumptions.
- Competing hypothesis: <constraint issue, model issue, physical issue, silicon issue>
- Missing evidence: <report, replay, diagnosis trace>
3. Proposed action
- Minimal reversible change: <constraint fix, architecture tweak, pattern update>
- Expected metric movement: <delta>
- Regression risk: timing, power, quality, schedule
4. Signoff
- Re-run artifact: shift/capture timing report, at-speed validation logs, path-group summary
- Required owners: STA owner, DFT owner, PD owner
- Final decision: release, waive, rollback, or escalateTest signoff fails when shift/capture timing and test power are treated independently.
TEST SIGNOFF LOOP
test SDC -> shift/capture timing -> power-aware ATPG -> IR validation -> releaseTEST CURRENT
functional current baseline
scan shift current peak-risk zonetest-mode STA report
shift/capture split
test power IR map
waiver tracker
At-speed patterns passed timing but failed in production due to peak shift IR; staggered capture and power-aware fill resolved.
Tag test and functional corners separately
Check hold in shift mode
Correlate fail bins with power hotspots
Ask: what evidence proves this DFT decision is safe for production?
State metric, lot/corner context, and pattern tag with every claim.
Treat timing, power, and quality as one signoff problem.
Chasing coverage without legality checks.
Ignoring test-power side effects of pattern changes.
Debugging silicon without reproducible tags.
Shift mode is hold-sensitive while capture mode is setup-sensitive; closure must preserve both under test clocking assumptions.
Metric: shift hold violations, capture setup failures, at-speed pattern pass rate
This content block can't be displayed here.
Block type: unknown
This content block can't be displayed here.
Block type: unknown
This content block can't be displayed here.
Block type: unknown