STA Mastery · All levels

Generated Clocks & Dividers: Design Space

Design Space for Generated Clocks & Dividers.

Design space exploration

For Generated Clocks & Dividers, closure options trade margin, schedule, and regression risk.

Option A — conservative

  • Conservative margin: helps safe signoff

  • Risk: over-pessimism, area/power

  • Validate with: first silicon

Option B — balanced

  • Balanced derate: helps reasonable margin

  • Risk: needs approval

  • Validate with: mature node

Option C — aggressive ECO

  • Aggressive ECO: helps fast WNS gain

  • Risk: hold/SI regressions

  • Validate with: late schedule

Option D — RTL restructure

  • RTL restructure: helps structural fix

  • Risk: schedule hit

  • Validate with: chronic paths

diagram
DESIGN SPACE — Generated Clocks & Dividers
margin <-> performance <-> schedule
pick based on generated clock reachability, divide-by mismatch, pulse width violations on product scenarios

Design pitfalls

  • ECO without regression matrix

  • Constraint change without audit

Tradeoff curve

diagram
BEFORE / AFTER ECO — Generated Clocks & Dividers

WNS (ps)
  0 |                    --- target
-50 |    ● regressed
-80 |         ● before ECO
-20 |              ● after ECO
    +-------------------------------> ECO iteration
Prove setup AND hold moved safely.

STA deep dive

SDC quality determines whether STA measures reality or fiction.

Concept diagram

diagram
SDC FLOW

RTL clocks -> create_clock / generated_clock
board      -> set_input/output_delay
exceptions -> false_path / multicycle (audited)
analysis   -> report_timing

Metric graph

diagram
CONSTRAINT QUALITY

audited exceptions  ████████████████  good
stale IO delays     ██████            risk
missing gen clock   ████              high escape

Reports and artifacts

  • clock report

  • uncertainty budget

  • IO delay coverage

  • exception audit log

Mini case study

1000 new failing paths overnight: SDC merge dropped a generated_clock on divider output. No PD change needed.

Debug branches

  • Diff SDC before ECO

  • Validate clocks on failing path

  • Audit false paths quarterly

Senior review question

Ask: what corner/mode/view proves this topic is closed or failing?

Key takeaways

  • State corner, mode, view, and database tag with every slack claim.

  • Run setup and hold plus MMMC regression after every ECO.

Common pitfalls

  • Comparing STA runs with different SPEF or SDC tags.

  • Broad false_path to green-wash violations.

  • Setup-only ECO without hold check.

Principal STA review addendum

Generated clocks propagate from master clocks through dividers and muxes; incorrect -divide or -edges breaks downstream path grouping.

Metric: generated clock reachability, divide-by mismatch, pulse width violations