STA Mastery · All levels
Generated Clocks & Dividers: Reports & Metrics
Reports & Metrics for Generated Clocks & Dividers.
Reports and metrics
Reports & Metrics for Generated Clocks & Dividers focuses on generated clock reachability, divide-by mismatch, pulse width violations. The goal is to connect the observable symptom to timing mechanism, ownership, and regression risk.
The job of a report is to turn generated clock reachability, divide-by mismatch, pulse width violations into a closure decision. A single WNS number is almost never enough; you need path group breakdown, cell vs net split, and a clear gap between current slack and signoff target.
Metric movement
METRIC GRAPH — generated clock reachability, divide-by mismatch, pulse width violations
WNS (ps)
^
| target (0)
| - - - - - - -
| o after ECO + hold check
| o
| o baseline run
| o failing regression
+--------------------------------------> closure iteration
view audit path group fix MMMC signoff
Readout:
- explain why WNS/TNS moved and which path group drove the changeSlack distribution
SLACK HISTOGRAM — Generated Clocks & Dividers
path count
| ***
| *******
| ***********
|************* <- WNS (worst path)
+--------------------> slack (ns)
-0.15 0.0 0.10
Fix the left tail first; average slack misleads.Track generated clock reachability, divide-by mismatch, pulse width violations by path group, corner, and analysis view.
Report WNS/TNS and failing endpoint count together.
Include setup and hold splits; they often diverge after ECO.
Always store the metric next to the artifact that produced it.
STA deep dive
SDC quality determines whether STA measures reality or fiction.
Concept diagram
SDC FLOW
RTL clocks -> create_clock / generated_clock
board -> set_input/output_delay
exceptions -> false_path / multicycle (audited)
analysis -> report_timingMetric graph
CONSTRAINT QUALITY
audited exceptions ████████████████ good
stale IO delays ██████ risk
missing gen clock ████ high escapeReports and artifacts
clock report
uncertainty budget
IO delay coverage
exception audit log
Mini case study
1000 new failing paths overnight: SDC merge dropped a generated_clock on divider output. No PD change needed.
Debug branches
Diff SDC before ECO
Validate clocks on failing path
Audit false paths quarterly
Senior review question
Ask: what corner/mode/view proves this topic is closed or failing?
Key takeaways
State corner, mode, view, and database tag with every slack claim.
Run setup and hold plus MMMC regression after every ECO.
Common pitfalls
Comparing STA runs with different SPEF or SDC tags.
Broad false_path to green-wash violations.
Setup-only ECO without hold check.