Mechanism for Test Power & IR focuses on peak test-mode current, IR drop hotspots, scan-induced thermal spikes. The goal is to convert metric movement into mechanism, owner, and release decision.
Scan activity can exceed functional switching, so pattern scheduling and power-aware ATPG are needed to avoid IR and thermal escapes. Think of DFT as a quality pipeline where setup quality determines what silicon evidence means.
Identify where controllability/observability is introduced.
Identify legal constraints and mode assumptions.
Identify failure class: architecture, constraints, physical, or silicon.
DFT CLOSURE FLOW - Test Power & IR
scan/test architecture
|
v
ATPG constraints + fault models
|
v
pattern generation + compression
|
v
timing/power/physical validation
|
v
silicon diagnosis and release signoff
Debug rule: always state metric, run tags, and owning team with any claim.scan toggling burst -> peak current -> IR droop / thermal rise
Mitigation: power-aware ATPG + pattern scheduling + capture staggeringDFT OWNERSHIP LAYERS - Test Power & IR
layer owns failure mode
---------------- -------------------------- -------------------------
rtl/architecture scanability hooks uncontrollable logic
atpg/constraints legal pattern intent aborts, low coverage
physical/clocking chain route + test clocks shift hold/timing escapes
tester/program pattern apply integrity false binning / bad fails
quality signoff release criteria escapes or schedule slipTest signoff fails when shift/capture timing and test power are treated independently.
TEST SIGNOFF LOOP
test SDC -> shift/capture timing -> power-aware ATPG -> IR validation -> releaseTEST CURRENT
functional current baseline
scan shift current peak-risk zonetest-mode STA report
shift/capture split
test power IR map
waiver tracker
At-speed patterns passed timing but failed in production due to peak shift IR; staggered capture and power-aware fill resolved.
Tag test and functional corners separately
Check hold in shift mode
Correlate fail bins with power hotspots
Ask: what evidence proves this DFT decision is safe for production?
State metric, lot/corner context, and pattern tag with every claim.
Treat timing, power, and quality as one signoff problem.
Chasing coverage without legality checks.
Ignoring test-power side effects of pattern changes.
Debugging silicon without reproducible tags.
Scan activity can exceed functional switching, so pattern scheduling and power-aware ATPG are needed to avoid IR and thermal escapes.
This content block can't be displayed here.
Block type: unknown