DFT / ATPG · All levels
Test Logic Floorplan: Comparison Matrix
Comparison Matrix for Test Logic Floorplan.
Comparison matrix
Chain order and placement strategy trade congestion and closure time.
+------------------+----------------+----------------+----------------+
| Approach | Strength | Weakness | Best when |
+------------------+----------------+----------------+----------------+
| Conservative | safe | higher cost | ramp-sensitive |
| Balanced | practical | needs rigor | production |
| Aggressive | fast | escape risk | schedule pressure |
| Architecture | durable | slow | repeated pain |
+------------------+----------------+----------------+----------------+When to choose each approach
Tie approach to product risk and tester constraints
Interview traps
Optimizing one metric only
No regression ownership
Evidence comparison
DFT EVIDENCE MATRIX - Test Logic Floorplan
+-------------------+------------------------+--------------------------+-------------------------+
| Evidence | Tells you | Does not prove | Next action |
+-------------------+------------------------+--------------------------+-------------------------+
| coverage report | fault detect trends | silicon root cause | inspect bucket details |
| pattern diff | generation changes | architecture quality | replay suspect patterns |
| timing/power report| test closure margin | diagnosis confidence | correlate fail logs |
| diagnosis summary | likely defect classes | ownership decision | assign action owner |
| signoff checklist | process completeness | correctness of evidence | peer review artifacts |
+-------------------+------------------------+--------------------------+-------------------------+DFT deep dive
Physical integration quality decides whether DFT architecture survives implementation realities.
Concept diagram
PHYSICAL DFT FLOW
chain planning -> floorplan placement -> route -> test timing/power validationMetric graph
ROUTING BURDEN
poor chain order -> longer routes -> more hold buffersReports and artifacts
scan physical wirelength
congestion heatmap
test clock skew
handoff issue tracker
Mini case study
Late scan reorder reduced route detours and eliminated a major shift hold cluster before signoff.
Debug branches
Correlate chain order with congestion
Place compression logic near chain clusters
Keep DFT-PD handoff versioned
Senior review question
Ask: what evidence proves this DFT decision is safe for production?
Key takeaways
State metric, lot/corner context, and pattern tag with every claim.
Treat timing, power, and quality as one signoff problem.
Common pitfalls
Chasing coverage without legality checks.
Ignoring test-power side effects of pattern changes.
Debugging silicon without reproducible tags.
Principal DFT review addendum
Placement of decompressors, compactors, and BIST controllers impacts routing quality, clocking, and timing closure effort.
Metric: compression logic placement quality, test route detours, floorplan DFT ECO count